Tube Union RMT recently warned that London Underground is on the verge of plunging the Capital’s tube system into the same lethal cocktail of safety cuts and automation that led to nine people being killed on the Washington D.C. Red Line service just over two years ago.
Click Link to Access Free PDF Download
“The 5Cs to Taking a Bulletproof Injured Worker Recorded Statement”
RMT leaked the details of the plans recently despite protests from TFL that they were merely “blue sky thinking”. Only days later, the same plans were confirmed as the core operational strategy.
Recently, there has been much talk of automated systems already operating. One such was the 35-year-old Washington D.C. metro, which switched to manual operation in the wake of a horrific rush-hour crash in June 2009, which killed nine people, including the operator.
The collision was caused by failure of the automated system, and the Washington Post called it the “price of parsimony” after numerous near-misses went unheeded against a background of cuts to maintenance schedules and inspections – exactly the same cuts-led culture now being imposed by LU.
RMT General Secretary Bob Crow noted, “We need no more evidence of what happens when cuts-led automation and changes to maintenance are imposed from above than the tragedy on the Washington DC Red Line in June 2009.
“The same lethal combination of cuts and automation is now at the core of LU’s strategic thinking and RMT will mount the fiercest opposition to these politically motivated plans that have more to do with next year’s Mayoral election than they do with providing a safe transport service for London. (WCxKit)
Author Robert Elliott, executive vice president, Amaxx Risk Solutions, Inc. has worked successfully for 20 years with many industries to reduce Workers Compensation costs, including airlines, healthcare, printing/publishing, pharmaceuticals, retail, hospitality and manufacturing. See www.LowerWC.com for more information. Contact: Info@ReduceYourWorkersComp.com.